Cross reference
What I would offer instead
Every bid has a fixture on it that I do not represent. These pages answer the next question honestly: what lands in the same place, what changes when you swap, and what has to be checked before anybody writes a substitution request.
- Published figures only
- Mostly lines I represent
- One outside option each
- South Florida conditions
- No factory cross

How these are built
The rule these pages follow
Each page lists several lines I represent for SESCO, and exactly one option that is not on my line card. The outside option is labelled as such and it is there on purpose. A comparison that only names what I sell is a sales sheet, and an engineer can tell the difference in about ten seconds.
Every number in the tables is quoted from the manufacturer that published it, with the family and the sheet named. Where a manufacturer does not publish something the reader would expect, the page says it is not published rather than filling in a plausible figure. That is the whole point of the exercise: you can check me.
What these pages are not is a factory cross reference. No manufacturer publishes an equivalence between these products. Nothing here is approved, equal in a contractual sense, or guaranteed to clear a submittal. The photometrics get re-run against the actual room or site, and the engineer of record decides.
The pages
Published cross references
Three so far, chosen because they are the three callouts that come up most often on South Florida drawings. More are being added.



Substitutions
What I actually do when you ask for an alternate
Run the layout in the alternate with the manufacturer photometric file, and put the point-by-point next to the basis-of-design numbers.
Write the line-by-line comparison a reviewer checks: lumens, distribution, CCT, CRI, mounting, dimensions, EPA and weight, dimming protocol, listing, finish, warranty and DLC status.
Give the pole engineer or the ceiling contractor the mechanical numbers in writing rather than in an email thread.
Say so plainly when the alternate does not match. An accepted substitution that fails at inspection costs more than the one I did not sell you.
When a swap is easy
Standard mounting, a distribution the alternate publishes, and no stamped photometric out for permit yet. Most retail, office, multifamily and industrial work sits here.
When I hold the spec
A control system the owner already runs, an optic placed to satisfy a light-trespass or coastal condition, or a job where the schedule is already out for permit.
What decides it here
The Florida energy code control requirements, coastal amber rules, HVHZ product approval on poles and attachments, and what salt air does to a finish.
Also useful
Tools that go with these pages
The calculators cover the arithmetic that comes up mid-substitution: circuit loading and breaker sizing, average footcandles and lighting power density, beam angle, and voltage drop. There is a blank fixture schedule workbook to download, with the South Florida columns already in it.
The turtle-safe fixture finder is the coastal companion to the area-light page: every amber model published by the lines I represent, filterable, with each wavelength claim quoted from the sheet it came from.
The guide specifications are the next step after an accepted substitution, and the SESCO line card is everything I can actually price.
Questions
What people ask about these pages
Is this a manufacturer cross reference?
No, and the pages say so. It is my recommendation as a manufacturer representative, built from what each manufacturer publishes. No factory has blessed any of these equivalences, and nothing here is approved or equal in a contractual sense.
Why is there a brand on here you cannot sell me?
Because a comparison that only lists what I carry is a sales sheet. Each page names one strong option outside my line card and labels it. You should know what you are choosing between.
Can you match the specified fixture exactly?
Almost never, and neither can anyone else. What I can do is land in the same published lumen band with an optic covering the same distribution, and show you the layout so you can judge it.
What do you need from me to price an alternate?
The fixture schedule and the drawings. For a site, the pole locations and the footcandle and uniformity targets. For an interior, the ceiling type and thickness and the control intent. If the parcel is coastal, tell me the county and whether it is seaward of the coastal construction control line.
How often are these updated?
When a manufacturer revises a sheet the figures here go stale, so treat every number as of the revision the page names and ask me to confirm before it goes into a submittal. That is true of any published figure, mine included.
Next step
Send me the project
The schedule, the drawings, and the type you are stuck on. I will come back with the alternate, the comparison a reviewer will want, and a price.
Send me the project Call 786-395-1222 See the whole line card